Renewable energy development is not evenly distributed across the United States. It concentrates where solar irradiance is high, wind resource is strong, land is available, transmission infrastructure exists, and regulatory environments are favorable. The result is a geographic pattern that shows up clearly in interconnection queue data: a small number of counties contain a disproportionate share of queued capacity.

Pecos County, Texas anchors that list. A county in far West Texas with a population under 15,000, Pecos County has more queued renewable energy capacity than most US states. It is not an anomaly - it is the extreme end of a concentration gradient that runs through the same handful of desert, plains, and coastal counties that have always defined US renewable energy geography.

Why county-level analysis matters

Interconnection queue data is typically summarized at the ISO level - total projects, total MW, developer rankings. ISO-level summaries are useful for market sizing. But for developers, investors, EPCs, and landowners, county-level data answers the operational question: where is the development actually happening?

County-level analysis reveals:

  • Transmission hub concentration - Projects cluster around substation POIs and existing high-voltage transmission lines. County-level counts identify where transmission capacity is being saturated.
  • Developer competition - Multiple developers queuing in the same county are competing for the same transmission capacity, the same land, and potentially the same county permitting pipeline.
  • Emerging vs. saturated markets - A county with 5 projects queued for the first time is an emerging market. A county with 150 projects queued is likely saturated at some substations.
  • Land market signals - High project concentration in a county signals active land lease competition, which affects both lease rates and the feasibility of new entrants.

The top counties by queued capacity

County rankings using approximate coordinates (county centroid) would be less reliable. The top-20 list below focuses on counties where Load Factor has substation-level or better coordinate data, which is available for ERCOT, MISO, and a subset of other ISOs.

Pecos County, Texas

Pecos County sits in far West Texas, northeast of the Permian Basin. Its combination of factors is difficult to replicate:

  • Solar irradiance - West Texas receives among the highest horizontal solar radiation in the US
  • Flat terrain - Large contiguous parcels without topographic obstruction
  • Existing transmission - Multiple high-voltage lines connect the region to ERCOT's major load centers
  • Land availability - Ranches and oil patch land available at lease rates that support project economics
  • Single-state permitting - Texas permitting is generally faster and more predictable than multi-state contexts

Pecos County consistently ranks first or second in ERCOT queue MW concentration and leads national county rankings in Load Factor's analysis.

Ward County, Texas

Adjacent to Pecos County, Ward County benefits from the same West Texas resource and transmission profile. Large utility-scale solar and storage applications fill its queue record.

Upton County, Texas

Another far West Texas county with high irradiance, flat terrain, and ERCOT transmission hub proximity. Upton County's queue portfolio includes significant storage applications alongside solar.

Reeves County, Texas

The heart of the Permian Basin ERCOT solar corridor. Reeves County is one of the most active development markets in the US. Solar resource quality is exceptional; ERCOT's 138kV and 345kV networks serve the area.

San Bernardino County, California

The largest county in the contiguous US by land area. San Bernardino County in California's Mojave Desert is the CAISO equivalent of Pecos County - a geographic concentration point for large-scale solar and storage applications driven by irradiance, land availability, and proximity to Southern California load.

CAISO queue projects in San Bernardino represent a significant share of California's total solar and storage pipeline. Developers range from national IPPs to California-based independents.

Kern County, California

California's historic energy hub. The Tehachapi Pass is Kern County's established wind corridor. Solar and storage applications have expanded Kern County's queue portfolio significantly. Proximity to Southern California Edison and PG&E transmission access points makes Kern County a high-value interconnection location.

Imperial County, California

The Imperial Valley in California's southeast desert is one of the highest-irradiance locations in North America. Imperial County's queue portfolio is concentrated in utility-scale solar and paired storage. CAISO's desert interconnection clusters center partly here.

Dodge County, Minnesota / Freeborn County, Minnesota (MISO)

Upper Midwest solar development has accelerated in MISO. Minnesota counties with strong solar resources and access to MISO's 345kV backbone transmission attract utility-scale solar applications, particularly as Minnesota's RPS requirements create procurement demand.

Perkins County, South Dakota / McPherson County, South Dakota (MISO)

South Dakota's wind corridor runs through the Great Plains counties along the Missouri River breaks. MISO wind applications in South Dakota concentrate in counties with strong wind resource and 345kV transmission access.

What drives county concentration

Five factors explain why development concentrates in specific counties:

1. Transmission infrastructure. The most fundamental constraint. Renewable energy projects need to deliver power to load. That requires a nearby high-voltage substation with available capacity. Counties with 345kV or 500kV transmission facilities receive disproportionate queue applications because the grid access problem is partially solved.

2. Resource quality. Solar irradiance, wind speed, and consistency determine project economics. The US renewable energy resource map is not uniform - the desert Southwest, the Great Plains wind belt, and the Texas Panhandle genuinely have better resources than other regions. Development follows the resource.

3. Land structure. Large contiguous land parcels with clear title are necessary for utility-scale projects. Counties dominated by large ranches or farm operations have different land lease markets than fragmented suburban parcels. West Texas ranch land and Great Plains agricultural land are structurally more compatible with large-scale development than the Eastern US.

4. Permitting environment. Some counties have established track records of processing renewable energy permits efficiently. A county that has permitted 20 solar projects has developed staff expertise, standardized review procedures, and a documented approval pathway. That reduces development cost and timeline for subsequent projects.

5. First-mover clustering. Developers follow each other. If one developer successfully develops a project in a county, others apply for adjacent parcels or nearby substation capacity. The clustering of multiple projects at the same transmission node is partly rational (the node is good) and partly behavioral (social proof and land competition).

Saturated vs. available markets

County-level data reveals markets that may be approaching capacity limits alongside those with room for new entrants.

Signs of saturation:

  • Multiple projects queued at the same substation POI
  • Interconnection studies repeatedly assigning large upgrade obligations to late-queue applicants
  • Land lease rates increasing as competition for remaining parcels intensifies
  • Transmission upgrade queues extending the timeline for new applications

Signs of an emerging market:

  • First or second applications at a substation with available capacity
  • New transmission line completions opening previously remote areas
  • Low land lease rates reflecting lack of competition
  • Permitting track record just being established

Load Factor's county-level view helps identify both. A developer scouting new project locations can use the county-level concentration data to find markets where transmission access exists but developer competition is not yet intense.

ERCOT geographic zones and county mapping

ERCOT's transmission zones roughly map to county clusters:

ERCOT zoneRepresentative counties
West Texas solar/storage hubPecos, Reeves, Ward, Upton, Crane, Winkler
South Texas / Rio GrandeStarr, Hidalgo, Willacy, Cameron, Webb
Panhandle / North Texas windGray, Roberts, Wheeler, Ochiltree, Lipscomb
Central TexasMason, McCulloch, Concho, Brown

West Texas leads by MW concentration. The South Texas corridor has grown with expanding 345kV transmission toward the Gulf Coast. The Panhandle remains wind-heavy with growing solar and storage co-location.

Frequently Asked Questions

Which US county has the most renewable energy projects in the interconnection queue? Pecos County, Texas consistently ranks first or among the top counties by queued renewable energy MW. Its combination of high solar irradiance, flat terrain, existing ERCOT transmission infrastructure, and large ranching land parcels makes it the dominant West Texas development hub.

Why do renewable energy projects cluster in specific counties? Five factors drive concentration: high-quality resource (solar irradiance or wind speed), nearby 345kV or 500kV transmission infrastructure, large contiguous land parcels with clear title, efficient permitting environments with project track records, and first-mover clustering as developers follow successful precedents.

Which California counties have the most solar and storage projects? San Bernardino, Kern, Riverside, and Imperial Counties in California's desert and inland areas dominate CAISO's solar and storage queue. San Bernardino County is the largest by land area and holds the most queue applications.

What does it mean when a county is "saturated" in the renewable energy queue? A saturated county has multiple projects competing for the same substation capacity. Interconnection studies for late-queue applicants may reveal large network upgrade obligations as available capacity is consumed. Land lease rates may also be elevated. Developers entering a saturated market face higher costs and longer timelines than in under-developed markets.

Does Load Factor show project locations at the county level? Yes. Projects with county-centroid coordinate assignments are flagged as approximate (coordinate_confidence = 'approximate') and displayed at the county centroid. Projects with substation-level or better coordinates (substation_poi, plant_site) are more precisely located. ERCOT has ~1,529 projects with substation-level or better coordinates.

Methodology

County concentration analysis uses county and state fields in Load Factor's projects table. Rankings exclude withdrawn projects and prioritize projects with coordinate_confidence != 'approximate' for accuracy. Pecos County ranking based on ERCOT geocoded project data. MISO and CAISO county rankings draw on projects with substation-level coordinates where available; county centroid projects are included with the caveat that their county assignment may not reflect exact substation location. All MW figures use summer_mw with winter_mw fallback.

Conclusion

Renewable energy development concentrates in a small number of counties because the underlying drivers - transmission, resource, land, permitting, and precedent - are themselves geographically concentrated. Pecos County, Texas is the national exemplar: a single, thinly populated county that contains more queued capacity than most US states, because it sits at the intersection of every factor that makes development viable.

County-level visibility is where queue intelligence becomes most actionable for market entry, competitor mapping, and land market research.

Browse queue projects filtered by county and ISO to see the concentration pattern directly. For the ERCOT context that anchors the West Texas concentration, read ERCOT Interconnection Queue: Who's Building Texas Renewables?.

Share this

Load Factor tracks 38,000+ interconnection queue projects, withdrawn included, across 16 North American markets, with the evidence behind every developer it names.

Next step

See your market in 30 minutes.

A walkthrough of the projects, developers and evidence in the markets you work in.

Get the weekly brief

Queue movement, newly identified developers and the week’s deals, every Monday. Read past issues

Book a 30-min walkthrough