ERCOT's interconnection queue is smaller than PJM's and MISO's. At 3,285 projects, it does not dominate the national headline count. What it does is answer the question that matters most in queue research: who is actually developing these projects?
Load Factor's ERCOT coverage identifies a developer on roughly 2,612 of those projects, each with its confidence level and the sources behind it. For comparison, PJM still has 4,229 unknowns out of 10,875 total projects.
That contrast is not incidental. It reflects structural differences in public record quality, and it makes ERCOT the market where queue intelligence most consistently delivers actionable developer identification.
ERCOT by the numbers
| Metric | ERCOT |
|---|---|
| Total projects | 3,285 |
| Projects with developer identified | ~2,612 |
| Unknown / unresolved | ~477 |
That coverage rate does not happen by accident. ERCOT's single-state structure and the quality of Texas's public records combine to produce an attribution environment that multi-state ISOs cannot match.
Battery storage is ERCOT's dominant queue story
ERCOT's fuel mix is more storage-heavy than almost any comparable US market.
| Fuel type | Projects | Capacity (MW) |
|---|---|---|
| Battery Storage | 1,540 | 246,279.3 |
| Solar | ~800 | Substantial |
| Wind | Significant | Large |
Battery storage leads at 1,540 projects and 246,279.3 MW - making ERCOT the second-largest named ISO for standalone storage applications, behind only the aggregated Western markets.
The reason is straightforward. ERCOT is one of the world's most price-volatile electricity markets. It operates largely in isolation from the Eastern and Western interconnections. Congestion events, ancillary service needs, and merchant revenue opportunities create BESS economics that many other US markets are still developing toward.
Texas is also the second-largest state for queued solar capacity nationally. Wind, which defined ERCOT's early clean energy buildout, continues to hold a substantial share. The result is a queue that represents all three major clean energy technologies at meaningful scale - and one where a single state's public records cover all of them.
ERCOT does not publish project coordinates - here is how Load Factor solves it
Every analyst using ERCOT queue data encounters the same problem: the GIS Report ERCOT publishes includes county and point-of-interconnection (POI) substation name for each project, but not latitude or longitude.
This is not an oversight. It is how ERCOT's public disclosure works. The result is that any map of ERCOT projects needs a second step to place each project before it becomes spatially useful.
Load Factor places each ERCOT project as precisely as the public record allows, and labels every pin with how exact it is:
| Pin precision | What it means | Projects |
|---|---|---|
| Project site | The project's own location | 230 |
| Plant site | The location of the matching operating plant | 298 |
| Substation | The point of interconnection substation | 983 |
| Line segment | The midpoint of the line the project taps | 18 |
| Approximate | The county centre, where nothing better exists | ~1,560 |
Approximately 1,529 ERCOT projects have substation-level or better coordinate accuracy. The remaining ~1,560 fall back to county centroid, which Load Factor flags explicitly so users know when a map pin is approximate rather than exact.
Why ERCOT attribution quality exceeds every other major ISO
Three structural factors explain the evidence advantage.
One state, one set of records. Texas's business registry covers all domestic and foreign LLCs registered to operate in the state, and almost every ERCOT queue SPV has a Texas record. One set of state records, one family of county public records and one regulator cover the whole market. In MISO's or PJM's multi-state footprint, each of those multiplies.
Consistent public records statewide. Texas's state and county records are more uniform than those of most multi-state markets, so the same questions about a project can be asked the same way in every county.
Texas has the highest operating plant density for wind and solar in the US. When a queue project reaches commercial operation, it typically shows up in federal plant records within 12–18 months, a second, independent record of the company behind it. Texas's deep operating fleet makes that corroboration common.
How Load Factor traces ERCOT developers
Every ERCOT project follows the same rules as everywhere else:
- Start from the queue record. ERCOT's GIS Report names the interconnection customer - the legal entity on the queue application, usually an LLC or SPV. Load Factor shows that name exactly as filed.
- Look for independent public records. Grid-operator and federal filings, state and county records, corporate disclosures, plant data, and many more can each say something about the company behind the SPV.
- Confirm only on agreement. A developer shows Two sources agree only when two or more independent primary sources name it. One source makes it named in the queue (when that source is the grid operator's queue) or inferred; none means not identified. News supports, but never confirms.
- Check the label. Every attribution shows its confidence level and the sources on file, and we are re-grading any that claims more than its sources support.
ERCOT's numbers are higher because the records line up more often, not because the bar is lower. The result is an attribution with a documented evidence chain rather than an editorial guess.
Top ERCOT developers by queued MW
What public market context makes clear is that ERCOT's developer base spans large utilities with Texas generation assets, national renewable IPPs with established Texas presence, and infrastructure-fund-backed merchant storage platforms. The storage-heavy portion of the queue includes names well-known in ERCOT's wholesale markets that may be less visible in cross-ISO reporting.
Because Load Factor's attribution is conservative - a name only reads Two sources agree if at least two independent sources name it - a ranking of those names has a known floor. It contains no guesses.
Browse ERCOT developer rankings to see the current attribution snapshot with evidence counts and confidence levels.
Geographic concentration in ERCOT
ERCOT's project geography follows the transmission grid, which in Texas concentrates developable capacity in a few major zones.
West Texas - the Permian Basin and adjacent ERCOT transmission hubs - holds the largest share of solar and storage applications by MW. High solar irradiance, existing transmission infrastructure, and proximity to major ERCOT pricing hubs make this the central solar development zone.
South Texas - the coastal and inland zones including the Rio Grande Valley corridor - carries heavy solar and hybrid storage activity. Expanding transmission build-out has attracted large-scale applications.
The Panhandle and North Texas - historically the core wind zones - are now seeing increasing solar and storage overlap. The economics for non-wind generation in these zones have improved as battery costs have declined and wind-region transmission remains constrained.
County-level concentration data for ERCOT is available on Load Factor's project map. Because ERCOT does not publish coordinates directly, every pin carries the precision label described above.
What ERCOT queue coverage enables
For investors and lenders: ERCOT is the best US queue market for evidence-backed developer due diligence. An attribution two sources agree on in Load Factor's ERCOT coverage shows the specific public records that support it. That citation depth is not available from most queue data sources.
For developers entering Texas: The depth of developer identification means competitor mapping is actually possible at the county level. Knowing which sponsors are accumulating storage or solar MW in a specific transmission zone is decision-useful information before an interconnection application is filed.
For EPCs and equipment vendors: ERCOT is where the counterparty question is most tractable. With roughly 2,612 projects having some developer identification, the pool of nameable project sponsors is real and large.
Frequently Asked Questions
How many projects are in the ERCOT interconnection queue? Load Factor tracks 3,285 ERCOT queue projects covering Texas's solar, wind, and storage development markets.
Why is developer research easier in ERCOT? ERCOT's single-state structure means one set of state records, one family of county records and one regulator cover the whole market, and Texas's dense fleet of operating plants adds independent corroboration. Multi-state ISOs cannot replicate that geographic consistency at scale.
Does ERCOT publish project-level coordinates? No. ERCOT's public GIS Report includes county and POI substation name, not latitude/longitude. Load Factor places each project as precisely as the public record allows and labels every pin with how exact it is, including county-centroid approximations.
What fuel type dominates ERCOT's queue? Battery storage leads by MW with 1,540 projects and 246,279.3 MW. Texas's merchant electricity market creates sustained BESS economics. Solar and wind are both substantial alongside storage.
How does ERCOT compare to PJM on developer identification? The contrast is stark. ERCOT has a developer identified on roughly 2,612 of 3,285 projects. PJM still has 4,229 unknowns out of 10,875. The difference reflects how well the public records line up, not project quality.
Methodology
ERCOT project count (3,285) and developer coverage (~2,612 identified) reflect Load Factor's current resolution snapshot as of mid-2026. Fuel-type distributions use the fuel_type field in the projects table. Every map pin carries a precision label. A developer shows Two sources agree only when two or more independent primary sources name it, as described in Who Is Behind That SPV?. All MW figures use summer_mw with winter_mw fallback.
Conclusion
ERCOT is the proof case that forensic queue intelligence can work at scale. The developer coverage is real, the evidence is documented, and the geographic resolution is meaningful. No other major US ISO delivers the same combination.
Browse all ERCOT queue projects with developer attribution. For the national storage context that ERCOT anchors, read Battery Storage Is Flooding US Interconnection Queues. For the full ERCOT data profile, see the ERCOT queue reference page.