Skip to content
LOAD FACTOR

FAQ

Answers, with sources.

Coverage, methodology, confidence levels and access. Anything missing, ask us on a walkthrough.

FAQ

Frequently asked questions

About Load Factor

What is Load Factor?

Load Factor is an interconnection queue intelligence platform that identifies the developer behind each US queue project from documentary evidence, instead of republishing the SPV name on the filing.

Who uses Load Factor?

Project developers sizing competition at a site, infrastructure investors diligencing a pipeline, EPC and equipment firms building account lists, and research and advisory teams that need citable queue statistics.

What does Load Factor add to queue data?

It connects each queue record with the project entity, the developer and, where a filing proves it, the parent company, and keeps the confidence and any uncertainty visible on the record.

What should I evaluate in an interconnection data tool?

Market coverage, freshness, where each fact comes from, how entities are resolved, whether confidence is labelled, and how easily a project can be taken into diligence or exported.

Coverage

What markets does Load Factor cover?

Sixteen North American markets: PJM, MISO, ERCOT, CAISO, SPP, NYISO and ISO-NE, the Southeast and West non-RTO regions, and seven Canadian markets: AESO (Alberta), BC, IESO (Ontario), Manitoba, the Maritimes, Quebec and Saskatchewan. The largest by tracked projects, withdrawn included, are PJM (8,857), the West (8,207) and MISO (5,295).

Do you cover distributed generation?

Where the source supports it. New York distributed generation is tracked separately from utility-scale queue projects, and the product keeps the two apart.

Do you cover markets outside North America?

No. Load Factor covers the United States and Canada, end to end.

Who is developing this interconnection queue project?

Load Factor identifies the developer behind each interconnection queue project by tracing ownership through filings, including the special purpose vehicles and LLCs developers file under, and backs every attribution with its evidence and a confidence level, so you can see whether two independent sources agree on a name, or it is inferred from one.

Which developers are most active in MISO's interconnection queue?

In MISO's queue, Load Factor's data as of September 17, 2026 shows battery storage developers moving fastest: NextEra is running a battery campaign across Indiana — Steamboat (500 MW), Merom (500 MW), Crosley (400 MW), and Sandcut (350 MW) — aimed at tech-driven load, while Northern Indiana Public Service Co.'s 600 MW Malden battery targets hyperscale campuses. On the gas side, Maple Creek's 641.8 MW Sullivan County combined cycle and the 400 MW Trotman Energy Center are tied to the Heartland Industrial Park data center campus.

Data and methodology

Where does Load Factor's developer data come from?

From 270,000+ pieces of evidence across 79 kinds of public source: grid-operator interconnection queues, federal filings (FERC, SEC, EIA), state and local public records, news and announcements, and many more. A developer is marked Two sources agree only when two or more independent primary sources name it, and every project shows its confidence level: two sources agree, named in the queue, inferred or not identified. Every attribution shows the sources on file, and we are re-grading any that claims more than its sources support.

How is Load Factor different from other interconnection queue datasets?

Most queue datasets republish the ISO's interconnection customer field, which is usually a special-purpose entity. Load Factor resolves that entity to the company behind it, shows the evidence and confidence for every attribution, and says plainly when a project is unattributed rather than guessing a parent company. 21,000+ of 38,000+ tracked queue projects have a developer on file today; both counts include withdrawn requests.

How do you confirm a developer?

When two or more independent primary sources name the developer, the attribution is marked Two sources agree. When the grid operator's queue is the one source, it is marked Named in the queue; any other single source makes it inferred, and no evidence means not identified. Every attribution carries its evidence chain.

What does each confidence level mean?

Two sources agree: two or more independent authoritative sources name the developer. Named in the queue: the grid operator's queue names it. Inferred: weaker support so far. Not identified: no evidence yet. We are re-grading any attribution whose label claims more than its sources support.

How often is the data updated?

Queue data is refreshed daily for the major ISOs. FERC contract data follows each quarterly filing. Evidence research runs continuously.

How do you handle data accuracy?

Every attribution is backed by a source-linked evidence chain and a confidence level, a developer reads Two sources agree only with independent corroboration, and SPV names are shown as filed rather than replaced with guesses.

Access

How do I get access?

Book a walkthrough. We scope the markets and products your team needs, then set up access for your team; pilots are available on request.

Is there an API?

Yes. An MCP server lets Claude or ChatGPT query Load Factor with your account, and the developer documentation covers the tools it exposes.

Can I export data?

Yes. Project lists export to CSV with their sources attached, and records can be exported in the Orange Button format.

How do plans work?

Each plan is a combination of products: Pulse on its own, Pulse with Price, Pulse with Demand, or all of them with early access to Horizon. We set it up around the markets your team covers.

Can we start with a pilot?

Yes. Book a walkthrough and we will scope a pilot around your markets and questions.

Can we add products later?

Yes. Products can be added to a team's access at any time.

Is Horizon available?

Horizon, our forecasting product, is not available yet. Join the waitlist to hear when early access opens.

Features

What is on a Load Factor company page?

A company's queue projects in every market it works in, its footprint by market, state and technology, its parent, subsidiaries and project companies, and the deals, filings and power contracts that name it. A data-center operator's page also lists its sites.

What does Two sources agree mean in Load Factor?

A developer shows Two sources agree only when two or more independent primary sources name it. A developer named only by the grid operator's queue shows Named in the queue, one named by another single source is inferred, and a project with nothing on file shows Not identified.

Which plants does Load Factor cover?

Operating power plants across the United States, from federal plant data, each with its owner, operator, reporting utility, generation and emissions history.

What kinds of deals does Load Factor track?

Acquisitions and sales, financings, investments and capital raises, joint ventures, power purchase agreements and distress events, from news and announcements.

Is every pin on the map exact?

No, and Load Factor says so. Each project's map says whether its location is the project site or an approximation, such as the substation it connects to, its ZIP code or its county.

What does the power supply outlook measure?

The generation queued within the radius you choose, how much of it is likely to come online each year at historical completion rates, and its capacity value, against the load you plan.

Where does the contract data come from?

From the quarterly filings wholesale power sellers make with FERC, back to 2013.

Which companies have a page?

Developers, parent companies, public filers, power buyers and sellers, and data-center operators each have a page, so you can follow a name from the queue to the group behind it.

Why show the project company exactly as filed?

Because the filed name is what matches other records. Words like Solar, Wind and Storage stay in the name, since they are often the only thing that tells two project companies apart.

What does a plant page show around the plant?

The queue projects it came from, the queue projects within 10 miles, the data centers within 25 miles for Load Factor Demand accounts, and the nearest grid pricing node.

Is each deal linked to a project?

Where an article names a queue project or a company Load Factor tracks, the deal is linked to it and appears on that project's page and the company's page. An article that names neither stays in the feed, unlinked.

Which layers can I turn on?

Transmission lines by voltage, operating plants and data centers, plus current-day nodal prices and power contracts where your plan includes them.

Is the outlook an interconnection study?

No. It is an indicative screen. It ignores transmission limits, other loads competing for the same supply, existing plants and imports.

Who has a buyer or supplier page?

Every buyer in those filings, from utilities to corporates and other offtakers, and every seller, named exactly as filed.

Does Load Factor name a company's parent?

Only when a public record proves the link. Project companies are shown exactly as filed, and a parent is never guessed from a look-alike name or a shared address.

When does Load Factor name a parent company?

Only when a public record proves it. A look-alike name or a shared address is not proof, so the parent stays blank until a record settles it.

Does a plant page show who buys its power?

Where a plant's power contracts can be tied to it in federal filings, the buyers and terms appear on the plant page with Load Factor Price. Otherwise the section stays empty rather than guessed.

How often is the news feed updated?

Several times a day. Each article keeps its date, a short summary and a link to the original source.

Can I see substations?

Yes, around a site. Screen any point on the map, or open a data-center page, to list the substations and transmission lines nearby, with each line's voltage and owner.

Can I run it where there is no data center?

Yes. Pick any point on the map, enter a planned load and a year, and the same outlook runs there.

Can I see which contracts are ending soon?

Yes. The Expiring view lists contracts that end in the next 6 to 60 months, with the seller, buyer, capacity and term, so you can see which projects will need a new buyer.

Are withdrawn projects on a company page?

Yes. Withdrawn and suspended positions stay on the company's project list next to the active ones, each with its status, so you see its whole history in the queue.

Where do the sources come from?

Public records only: grid-operator interconnection queues, federal filings (FERC, SEC, EIA), corporate disclosures, state and local public records, plant and market data, news and announcements, and many more. Each link lists the records behind it.

How current is the generation data?

Generation is shown month by month as federal data is published, and each plant page says which month its figures run through.

Where else do deals appear?

On each project's page, in a company's Deals & events tab and in the weekly brief, which goes out every Monday.

Which markets are on the map?

All 16 North American markets Load Factor covers, in the United States and Canada.

Can I share the result?

Yes. The site power report puts the outlook for a site on a one-page PDF, with the sources behind every figure, on plans that include exports.

Is every seller linked to a queue project?

Only where the public record supports the link. Anything weaker stays unlinked rather than guessed.

Where do the data-center figures come from?

Sites come from open map data and state and local public records. Power and build-out figures for AI data centers come from Epoch AI, credited under CC BY 4.0.

Competitor intelligence

Can I see every project a competitor is building?

You see every queue project Load Factor ties to the company, in every market we cover, with withdrawn requests marked. A project filed under a company we cannot yet tie to anyone stays unattributed rather than guessed, so the list is what the public record supports today.

How does Load Factor know which LLCs belong to a developer?

From public records: grid-operator queues, federal filings (FERC, SEC and EIA), corporate disclosures, state and local public records, news and announcements, and many more. Each link shows the records behind it and a confidence level, and a parent company appears only when a record proves it.

Will I hear when a competitor files something new?

Queues are refreshed daily for the major markets. Set an alert on the markets and technologies you compete in to hear about new requests, and watch a competitor's projects to hear when a status, the developer or the owner changes.

Are project company names cleaned up?

No. Each project company is shown exactly as filed, because the filed name is what matches other records. Words like Solar, Wind and Storage stay in the name, since they often tell two project companies apart.

Methodology

What is an SPV in interconnection queue data?

An SPV (special purpose vehicle) is a project-level LLC that developers use to file interconnection requests, which can hide the ultimate parent company behind layers of entities. Load Factor traces ownership through those SPV layers to the actual developer, using federal, state and local public records, and many more — the same evidence work that separates real projects from speculative placeholders.

Queue basics

How long does it take a project to move through the interconnection queue?

New generation in the United States now takes an average of about five years to move from interconnection request to commercial operation, up from less than two years in 2008, according to Lawrence Berkeley National Laboratory research. In PJM, projects have waited an average of more than five years — which is why restarted plants holding existing interconnection rights, like the 2.25 GW of nuclear restarts at Palisades, Crane, and Duane Arnold, can reach the grid years ahead of new queue entrants.

Market

How much of the interconnection queue is driven by data centers?

Data centers are now the dominant driver of new load requests: as of August 2026, ERCOT was studying more than 474 GW of proposed new load — over five times its all-time record peak — with roughly 90 percent attributed to data centers. On the generation side, data center demand has pulled more than 100 GW of gas into interconnection queues, and PJM's first reformed queue cycle drew 220 GW of requests, with gas the largest fuel at 105.8 GW across 157 projects.

More answers

How do I diligence a developer's claimed pipeline? Which queue milestones actually predict completion?

Start with base rates, then check milestones. Lawrence Berkeley National Laboratory's Queued Up data shows only 19% of projects that entered US interconnection queues between 2000 and 2018 had reached commercial operation by the end of 2023, while more than 70% withdrew. Completion varies by fuel: gas 31%, wind 20%, solar 13%, batteries 11%. Any pipeline claim deserves those haircuts first. The milestones that actually separate real projects from slideware: - **Executed interconnection agreement.** Only about 12 to 13% of queued capacity ever reaches this stage. One analysis of 38,000 queue requests found that projects reaching an agreement within two years of entry withdrew 14% of the time afterward, versus 41% for projects still stuck in studies. - **Site control.** FERC Order 2023 now requires 90% site control at the interconnection request stage and 100% by the Facilities Study agreement. A project without it is not serious. - **Money at risk.** Study deposits run $55,000 to $250,000 depending on project size, and withdrawal penalties now scale from twice the study costs up to 20% of network upgrade costs. Ask what the developer has already paid and what they forfeit by walking

How do I tell whether a queue position is real or speculative?

For most of the last decade, entering an interconnection queue was close to free, so developers filed speculative requests to hold options. The result: queues full of projects with no financing, no permits, and no real chance of being built. FERC Order 2023 was written specifically to end this, with 90% site control required at entry, study deposits of $55,000 to $250,000, and withdrawal penalties that grow the further a project gets. Practical signals, in order of reliability: 1. **Has it executed an interconnection agreement?** This is the single strongest tell. Everything before it is a study. 2. **Is it advancing through study phases?** Berkeley Lab cost research found withdrawn projects faced average interconnection costs of $452/kW versus $102/kW for completed ones. Cost surprises from cluster studies are what kills projects, so a project surviving successive studies is passing real tests. 3. **Site control and deposits.** Post-Order 2023, these are table stakes. Ask for proof. 4. **Developer track record.** Some developers consistently convert queue positions into steel in the ground. Most do not. 5. **Offtake.** A contracted buyer means someone else did diligence too. One h

Where can a 100+ MW data center actually get power before 2030?

Time to power is now the binding constraint on AI infrastructure, and it varies sharply by market. One recent analysis put the site-selection-to-energization timeline at about 7 years in Northern Virginia (PJM), 5.5 years in California (CAISO), and 5 years in Texas (ERCOT) and the Midwest (MISO), for an average of roughly 5.5 years. PJM's own data shows AI infrastructure projects entering service in 2025 took more than 7 years on average, with about 3 years to reach an interconnection service agreement and another 4 after approval. Three things to weigh: - **The bottleneck has moved downstream.** PJM notes the biggest delays are no longer inside the queue. Transmission buildouts, substation capacity, and transformer lead times (reported at 128 weeks) now dominate. - **Texas is a special case, and it just changed.** ERCOT's large-load queue hit 474 GW against roughly 90 GW of peak demand, triggering a state freeze on new data center interconnection approvals and Senate Bill 6 gating: site control proof, self-funded upgrades, duplicate-request disclosure, and curtailment obligations. Do not underwrite Texas timelines on 2024 assumptions. - **Workarounds are going mainstream.** Behind

How exposed is my operating asset to new queued supply in the same zone?

New supply in your zone compresses capture prices and cannibalizes merchant revenue. The question is how much of the queued megawatts near you will actually show up. Most of it will not. A practical exposure screen: 1. **Map the queued capacity in your zone and price node**, by fuel and size. This is your gross exposure. 2. **Haircut it hard.** Nationally, only 19% of 2000-2018 queue entrants ever got built. Berkeley Lab data shows 62% of queued capacity carried a proposed online date by end of 2025, but only 13% had an executed interconnection agreement. Treat the uncontracted, pre-agreement share as mostly noise. 3. **Weight by study status.** Projects with executed agreements and completed facilities studies are the ones that can actually affect your revenues inside your hold period. Early-study projects are option value, not supply. 4. **Watch the cluster.** A neighbor's withdrawal can trigger restudies that change your own upgrade costs and timelines, even if that neighbor never builds. 5. **Check the fuel mix.** Solar-heavy incoming supply hits midday capture prices. Storage-heavy supply hits evening spreads. Match the exposure to your asset's revenue profile. Run this screen

What are typical network upgrade costs per MW by ISO and zone?

Berkeley Lab's interconnection cost research gives the clearest public benchmarks. For projects that completed all interconnection studies, average costs were $102/kW for recent projects. Projects still active in the queue averaged $156/kW. Projects that ultimately withdrew faced $452/kW on average, and those high costs were likely a key reason they withdrew. The breakdown matters more than the headline: - **Broader network upgrades are the cost driver.** Point-of-interconnection facilities are similar across outcomes ($46 to $67/kW). The network upgrade share is what explodes: $57/kW for completed projects, $107/kW for active ones, and $388/kW for withdrawn projects, about 85% of their total. - **Costs vary by technology.** Recent averages: wind $399/kW, storage $248/kW, solar $209/kW, natural gas $108/kW. - **Costs are rising.** Estimated costs for active projects more than tripled over a recent four-year window. Two caveats. These figures come from MISO-heavy Berkeley Lab samples, so treat them as directional for other ISOs, not gospel. And zone-level costs swing wildly with cluster composition: your upgrade bill depends on who else is in your cluster and what the shared upgrade

Which projects in the queue already have PPAs or offtake, and does that change their odds?

A signed power purchase agreement or utility offtake contract changes a project's odds materially. It means contracted revenue, which unlocks financing, which is the thing most queue projects never get. No public dataset was found quantifying exactly how much a PPA improves completion odds, so treat the uplift as industry logic rather than a measured figure. How to check offtake status on a queued project: - **FERC Electric Quarterly Reports.** Sellers report contracted transactions quarterly. A project company showing up with executed sales is contracted. - **Utility procurement announcements.** Regulated utilities announce PPA signings from solicitations and integrated resource plans. - **Corporate buyer disclosures.** Large corporate offtake deals are usually press-released. - **State program awards.** Offshore wind solicitations and state clean energy procurements publish winners. In practice, stack offtake status on top of the standard diligence milestones: executed interconnection agreement, site control, study-phase progression. A project with both an agreement and a PPA is in a different risk category than one with neither, even at the same queue position. **Sources:** - LB

Which markets can I interconnect in fastest if I enter the queue today?

Historically, ERCOT was the fastest major market. It runs an energy-only market outside FERC jurisdiction with a lighter interconnection process, and timelines ran roughly 5 years versus 7 to 8 in PJM. But that advantage is narrowing fast, and Texas just hit the brakes: the large-load queue reached 474 GW, triggering a freeze on new data center approvals and Senate Bill 6 gating with site control, self-funded upgrades, and cluster studies for loads over 75 MW. The current picture: - **PJM: slowest.** Around 7 to 8 years from request to operation for recent projects. Deep queue, heavy upgrade costs. - **CAISO: mid-pack.** About 5.5 years, with strong policy support but intense competition for interconnection. - **MISO: mid-pack.** About 5 years, with cluster reforms underway. - **ERCOT: historically fastest, now gated.** The process edge remains for generation, but large loads face the new gating regime and an uncertain freeze timeline. - **SPP and ISO-NE: smaller queues, less data center competition**, which can mean faster study cycles for the right project. FERC Order 2023's cluster reforms are supposed to speed processing everywhere, but as of the latest Berkeley Lab reporting,

How do utilities allocate network upgrade costs to new large loads?

The industry is moving from socialized costs to "the load pays its own way." Under traditional cost-of-service regulation, a new data center's grid upgrades were spread across all ratepayers. With single campuses now adding hundreds of megawatts, regulators are rewriting the rules. The new allocation stack, visible in recent large-load tariffs: 1. **Customer-specific transmission and interconnection facilities.** The data center pays 100%. This is the least controversial piece. 2. **Shared network upgrades.** Allocated under FERC and regional rules, increasingly pushed onto the large customer through tariff terms. 3. **Generation and capacity.** Recent rulings (e.g., Wisconsin) require very large customers to fund 100% of the resources built to serve them, with 15-year minimum contract terms so costs cannot strand on other customers. 4. **Stranded infrastructure protection.** Minimum bills, collateral, and exit fees put the risk of a project that shrinks or never arrives back on the customer that requested the capacity. 5. **The federal backstop.** The Ratepayer Protection Act (H.R. 9340), passed by the House, directs states to consider a standard that large-load rates recover the

How do I tell real load interconnection requests from speculative ones in utility queues?

The generator queue's phantom problem has a load-side twin. Developers file interconnection requests for enormous loads, sometimes over a gigawatt, to lock in queue positions, and many never become real projects. ERCOT's large-load queue hit 474 GW against roughly 90 GW of system peak demand. Utilities cannot tell how much of that is real, which makes transmission planning guesswork and slows the projects that are serious. Signals that separate real load from phantom load: 1. **Site control documentation.** Texas now requires it before a large-load request advances. A request without a site is a placeholder. 2. **Study fees paid.** Meaningful non-refundable fees (Texas set a $100,000 minimum study fee under Senate Bill 6) filter casual filings. 3. **Duplicate-request disclosure.** Speculative developers file the same project in multiple queues. Texas now requires disclosure of duplicative requests statewide. Ask whether the load appears elsewhere. 4. **Curtailment acceptance.** Serious operators accept curtailment obligations during grid stress. Speculative filings balk at them. 5. **Physical progress.** Equipment orders, permits, and construction activity are hard to fake. Announc

How late are queued projects versus their originally announced online dates?

Late, by years, and getting later. Berkeley Lab data shows the median time from interconnection request to commercial operation more than doubled: under 2 years for projects built in the early 2000s, about 5 years for projects built in 2022, and over 4 years in the latest edition. In CAISO, timelines have averaged around 7 years. The announced dates are worse than the medians suggest. LBNL found that 62% of queued capacity carried a proposed online date by the end of 2025, but only 13% had an executed interconnection agreement, and the Lab explicitly notes that proposed online dates come from the original interconnection request and may differ from actual online dates. Most of those dates will slip. PJM's data adds a newer wrinkle: projects entering service in 2025 averaged more than 7 years, but only about 3 of those years were spent reaching an interconnection service agreement. The other 4 came after approval: transmission buildouts, substation capacity, and equipment lead times. The delay has moved downstream of the queue itself. Practical rule: never underwrite a supply forecast on developers' announced online dates. Haircut by study status, add 2 to 4 years for post-agreement

What do I get that ISO queue data does not give me?

The developer identity behind each SPV, the evidence chain proving it, a confidence level, plus PPA prices, buyers, deal signals, and grid data linked to the same project.

How do you identify the developer behind an SPV?

By matching the SPV across independent records: Secretary of State filings, FERC interconnection agreements and EQR filings, EIA-860 ownership, county parcels and permits, PUC dockets, SEC filings, and industry news.

What do Two sources agree, Named in the queue, Inferred and Not identified mean?

Two sources agree means two or more independent primary sources name the same developer. Named in the queue means the grid operator's queue names it and no second source has yet. Inferred means weaker support so far, shown with its source. Not identified means nothing is on file yet, and we say so.

What PPA data do you have, and how is it different from offer or modeled prices?

Load Factor reports realized prices from FERC EQR filings: what buyers actually paid for delivered power, with buyer, volume, and contract terms. Offer prices are asking prices and modeled marks are estimates, so the three numbers answer different questions.

How can I validate an attribution?

Review the evidence, source dates, independent corroboration, and the distinction between a documented project entity and an inferred parent relationship.

How does Load Factor handle uncertain ownership?

It preserves project and evidence context, then uses confidence labels and explanations to distinguish confirmed, verified, inferred, and unknown outcomes.

What should I check before choosing a queue data provider?

Whether it covers your target markets, reflects queue changes promptly, preserves provenance, and fits your diligence process; and how it handles withdrawn projects, duplicate records, project entities, parent relationships, and conflicting sources.

Next step

See your market in 30 minutes.

A walkthrough of the projects, developers and evidence in the markets you work in.

Get the weekly brief

Queue movement, newly identified developers and the week’s deals, every Monday. Read past issues

Book a 30-min walkthrough