Check planned transmission

Use the Transmission tab to see planned high-voltage lines, their cost, timing and status, and how many queue projects each one affects.

  • Web app
  • Updated

Overview

Transmission lists planned high-voltage lines: their portfolio, voltage, cost, length, states, target in-service date, status, developer, and how many queue projects each one affects. New lines can open a market to projects that are stuck in the queue today, so this is where to see which ones are coming.

Check planned transmission0:22 video. Sign in to Load Factor to watch it.
Check planned transmission0:22, captioned, with music
Steps in this video
  1. Step 1: Filter by portfolio
  2. Step 2: Sort by cost, voltage or length
  3. Step 3: See how many queue projects each line touches

What's covered

The tab covers regional transmission portfolios approved by grid operators, starting with MISO's Long Range Transmission Planning portfolios (Tranche 1 and Tranche 2.1). The cards at the top total each portfolio: the number of lines, the cost, the voltage and the in-service years.

Find lines

  • Portfolio: pick one in the list above the table.
  • Resolution: narrows by the developer's confidence level for the projects affected.
  • Sort by any column (cost, kV, miles, target date, queue impact).

Read a row

Column What it shows
Name The line, by its end points.
Portfolio The plan it belongs to (for example T1 or T2.1).
kV Voltage.
Cost ($M) The estimated cost.
Miles Length, where published.
States The states it crosses.
Target ISD The target in-service date.
Status Planned, in progress and so on.
Developer The company building it, once awarded.
Queue impact How many queue projects are near the line.