# Supply screen per data-center site (Load Factor Demand) (`get_data_center_supply_screen`)

A read-only tool of the Load Factor MCP server (https://mcp.loadfactorenergy.com/mcp), in the Load (data centers) group.

One data-center site's supply screen: for 10, 25 and 50 miles, the queue MW due online by a target year (default: the site's planned year, or 2028), the share expected to finish at historical completion rates, and that share as a floored cover percentage of the site's planned MW; the nearby queue project rows, the nearest substation and LMP node, and the app's own verdict sentence. Queue linkage is proximity-based, never a named interconnection link ("linkage": "proximity"): an indicative screen, not an interconnection study. Withdrawn and operating projects are counted apart and are not supply to come.

Returns {summary, site, planned_mw, planned_date, target_year, data_as_of, demand_source, radii, linkage, nearest_substation, nearest_lmp_node, nearby_projects, attribution, caveats}: each `radii` row gives `queued_mw`, `expected_to_finish_mw`, `capacity_value_mw` (floored to 0.1 MW), `cover_pct` / `cover_label` (empty without planned MW) and `verdict_sentence`; `nearby_projects` lists up to 50 within the widest radius with `distance_mi`; `nearest_lmp_node` is a location, not a price. Use search_data_centers to find the id.

## Parameters

| Parameter | Type | Required | Description | Allowed values | Default |
|---|---|---|---|---|---|
| `id` | string | yes | Site id from search_data_centers, e.g. osm:way/123456789. |  |  |
| `target_year` | integer | no | Year the cover is measured for (default: the site's planned year, or 2028). |  |  |

## Example

Ask your assistant: "Could nearby queued supply cover this site's planned MW by 2028?"

It would call the tool with a request like this one (your client builds and sends it for you):

```json
{
  "jsonrpc": "2.0",
  "id": 1,
  "method": "tools/call",
  "params": {
    "name": "get_data_center_supply_screen",
    "arguments": {
      "id": "epoch:google-fort-wayne",
      "target_year": 2028
    }
  }
}
```

## Availability

Listed to accounts with the Map module. Results follow your Load Factor permissions (ISOs, detail level, evidence depth and rows per call). See [Access & permissions](https://loadfactorenergy.com/developers/mcp/access-and-permissions).