# Find any project

Use the Projects tab to filter, sort, search and export every interconnection-queue project in your markets.

The **Projects** tab lists every interconnection-queue project in the markets on your plan, one row each: the queue ID, size, technology, location, the project company as filed, the developer, the stage and the dates. It is where most searches start.

Video: Find any project (41 s, captioned, with music). Sign in to Load Factor to watch it at https://loadfactorenergy.com/developers/guide/projects. Its steps:

1. Filter by technology
2. Sort by any column: biggest first
3. Scroll sideways for the developer, stage and dates
4. Search by project name, queue ID or company
5. Open a project for the full picture

## Queue and Operating

The row under the tabs has two views:

- **Queue:** projects in the grid operators' interconnection queues, including withdrawn ones unless you filter them out.
- **Operating:** power plants already running, with their owners, from federal plant records.

## Filter the list

Filters live in the sidebar on the left. They combine, and every chip you set shows above the table with an **×** to remove it.

### Step 1: Pick your markets

Open **Regions & states** to choose markets (ISO / RTO) and states. Or tick a market under **ISO / RTO**.

### Step 2: Pick technologies

Under **Fuel type**, tick Solar, Wind, Battery Storage, Hybrid and the rest. **Show more** lists the less common ones.

### Step 3: Pick a status

The **In queue**, **Operating** and **Withdrawn** buttons select whole groups of queue statuses at once. Or tick individual statuses such as Active or Suspended.

### Step 4: Set a size

Drag the **Capacity (MW)** slider to set a minimum and maximum size.

For everything else (developer, confidence badge, sources, location accuracy) open **All filters** with the funnel icon at the top of the sidebar. It has a search box of its own.

> [!TIP]
> Save a set of filters you use often with **Save portfolio**. Switch between saved portfolios with the selector at the top of the sidebar.

## Sort, choose columns and scroll

- **Sort** by clicking a column heading. Click again to reverse it. The arrow shows the current order.
- **Choose columns** with the columns button (to the left of **Watch this view**): show, hide and reorder them. Your choice is saved to your profile.
- **Scroll sideways** to reach the columns past the right edge: the developer, the stage, the queue date, the expected commercial operation date (COD) and when the row was last updated.
- **Rows per page** and the page controls are at the bottom.

## Search

Type in the search box above the table and press **Enter** or click **Go**. It matches:

- project names (for example *Bush Knob*),
- queue IDs (for example `J830`, `28INR0017`, `AE2-148`),
- Load Factor IDs (`GI-0010964`),
- company names: the project company or the developer.

The search adds to your filters. To search everything, clear the filters first.

## Columns at a glance

| Column | What it shows |
|---|---|
| Watch | The eye: click it to [watch the project](https://loadfactorenergy.com/developers/guide/lists-and-alerts). |
| ISO / ISO ID | The market and the grid operator's own queue number. |
| Load Factor ID | Load Factor's stable ID for the project, the same in every market. |
| Project name | The name the operator publishes, when it publishes one. |
| MW / Fuel / State | Size, technology and state. |
| SPV / LLC | The project company, exactly as filed. |
| Developer | The developing company, with its logo when we have one. |
| Stage | Where the project is in the interconnection process. |
| Queue date / Expected COD / Updated | When it entered the queue, when it expects to start operating, when the row last changed. |

## Open a project

Click a row to open the [project page](https://loadfactorenergy.com/developers/guide/project-page). **Back**, at the top left, returns you to the list with your filters, sort and page intact.

## Watch a view

- **Watch this view** follows every project that matches your current filters, including new ones as they enter the queue. See [Watch projects and keep lists](https://loadfactorenergy.com/developers/guide/lists-and-alerts).
- **Lead Score** ranks projects by how likely they are to be built.
